How to run a bow-tie session, the twelve mistakes that ruin them, and a checklist for reviewing someone else's.
Most bow-ties fail for procedural reasons, not conceptual ones. The method is not hard. Running it well is. The Bow-Tie Field Kit is the practice companion to the Risk Bow-Tie Method: who belongs in the room (and why the facilitator can't have a stake in the answer), how long a real session takes, and the build order that stops the workshop from becoming an hour-long argument about causes.
It covers the twelve most common ways bow-ties fail, from proposed controls listed as existing ones to "safety culture" dressed up as a barrier, and closes with a 26-point review checklist for assessing your own analysis or someone else's: a contractor's, a joint venture partner's, or a regulator's submission.
The test that runs through the whole kit: if nobody can say where a control is written down and who would notice if it stopped, it's a hope, not a control. Better to find that out in the workshop than in front of an auditor, a board, or a court.
Inside the kit:
- Who to invite, how long it takes, and the order of build (start at the knot, not the left)
- Facilitation notes for the moments that derail sessions
- The twelve most common bow-tie mistakes
- A 26-point review checklist covering scope, controls, escalation, and integration
- The diagram-to-table mapping that links your bow-tie to the risk register and controls library
This Field Kit sits alongside the SRMBOK Risk Bow-Tie Method eBook and is drawn from the forthcoming Risk Management Body of Knowledge (RMBOK).
















